Location: North Attleboro waste dump corner of Mt. Hope Street and Landry Ave 41

Economics

By Robert C.

Important - Read this before proceeding

These instructions reflect a task our writers previously completed for another student. Should you require assistance with the same assignment, please submit your homework details to our writers’ platform. This will ensure you receive an original paper, you can submit as your own. For further guidance, visit our ‘How It Works’ page.

Location: North Attleboro waste dump corner of Mt. Hope Street and Landry Ave 41′ 59’09.19″N 71’18’54.72’W
http://www.nattleboro.com/recycling-center
Determine the number of solar panels you could install and the potential power output
Panel Specifications
Panels: Solarworld 320W
DC output needs to be derated. Use the following site http://rredc.nrel.gov/solar/calculators/pvwatts/version1/derate.cgi
Take into account the following
SRECs for Massachusetts
Subsidies
5 year MACRS
Please prepare a spreadsheet for your solar project assuming 1MWdc operation. Assume 20 year life, 5 year MACRS depreciation schedule, $100 RECs, electricity sales of $0.05/KWh, 3% inflation, 0.5% annual loss in solar panel efficiency, annual operating costs of $50,000, and annual lease payments of $6,000 per acre
Set up a cash flow spreadsheet using the following parameters. Capital costs $2500/KW. 10% discount rate, 20 year life, capacity factor of 30% and O&M costs of $30/KW. No fuel costs and ignore taxes. Calculate what you will need to sell electricity for to obtain a zero NPV. What does a zero NPV mean and what happens at this point? How does this relate the levelized cost of energy?